One of the shows we provided staging for on the 4th of July was for the Foo Fighters at RFK Stadium. We built our biggest system, the Mountain Truss for the main stage, as well as delay towers, ADA platforms, mix positions and camera platforms. The Mountain Truss stage stood 80’ tall with 40’ wide sound wings and a 60’ turntable onstage. For the delay/spot towers, Mountain Productions built their newest delay tower design, utilizing our Mountain Truss towers. The 2 support structures were 70’ tall with 3 spot baskets integrated into each tower. This new design provides a sleek, unobtrusive tower design with impressive capacity.
Over the 4-day build, we collected some great pictures of the crew at work. Thanks to all who were involved with the event! Now let’s take a look…